Send us a message

24-Hour Emergency Service | (800) 901-HVAC (4822)

WarehouseWarehouse

Henry Avocado Refrigeration Project

Escondido, California

C&L Refrigeration helped design and build the refrigeration system for Henry Avocado’s Escondido plant, including an industrial multi-compressor rack system for avocado packaging and distribution.

Industrial Refrigeration for Avocado Ripening and Distribution


The refrigeration system supports forced air ripening rooms capable of operating from 40°F to 70°F, along with coolers, a palletizing area, docks, and a separate bin cooler for avocados after harvest. The system included semi-hermetic screw compressors with backup capacity, evaporative cooling, and thirty-two evaporator fan coils.

Quick Facts

Design-build industrial multi-compressor refrigeration rack system for avocado plant

Controls integrated with remote monitoring and trending capabilities

Bin cooler designed to cool 85°F entering products in 12 hours

System supports custom ripening of more than 1.5 million cartons of avocados annually with room to expand